科研 Skill
Rhino参数化几何工作流
rhino-grasshopper-workflow
Plans and reviews safe Rhino, Grasshopper, and RhinoCommon workflows including data trees and bake/export operations. Use for parametric AEC geometry pipelines and repeatable Rhino automation.
SKILL.md
Rhino / Grasshopper Workflow
Use for Rhino and Grasshopper-specific geometry and parametric automation. Route general IFC/DWG/DXF/SVG and other CAD/BIM tasks to cad-bim-automation; Revit/pyRevit/Dynamo tasks belong to revit-workflow.
Establish the working context
Record the Rhino and Grasshopper versions, operating system, document units and tolerances, coordinate system, available plug-ins, input file formats, and execution surface (manual Rhino, Grasshopper graph, Rhino Python, RhinoCommon, or a verified integration). Leave unknowns as UNKNOWN. Check the installed environment or official version-matched documentation before naming API members or components.
Model and graph safety
- Preserve source .3dm and .gh/.ghx files. Prefer a duplicate document, versioned definition, or new export path for experiments.
- Inventory inputs, expected outputs, geometry types, object counts, layers, units, tolerances, and reference dependencies before edits.
- Identify whether data is internal, referenced, or live-linked; do not assume external references are portable.
- Treat Grasshopper data trees explicitly: branches, paths, item ordering, graft/flatten behavior, nulls, and empty lists may change results.
- Identify cyclic dependencies, uncontrolled recomputation, stochastic inputs without fixed seeds, and expensive operations before batch execution.
- For any bake, replace, delete, or export action, require explicit scope and a reversible plan. Do not silently modify the original model.
- Never assert fabrication, structural, accessibility, or code compliance from geometry alone.
Repeatable workflow
1. Define invariants
Specify intended geometry and parametric relationships, allowable tolerance, expected counts, coordinate system, unit convention, and acceptance checks. State whether topology, object IDs, layer assignment, and naming must remain stable.
2. Preflight
Inspect definition inputs, slider ranges, referenced geometry, plug-in dependencies, data-tree shapes, missing components, warning/error states, and computation cost. Mark anything uninspected rather than guessing.
3. Prototype on a bounded sample
Prefer read-only inspection or a small subset first. Record baseline values and export previews to new paths. Verify closed/open curves and solids, invalid geometry, duplicate objects, normals, intersections, and bounding boxes where relevant.
4. Execute with checkpoints
For graph changes, document the components/parameters affected and expected branch-level output changes. For scripting, use the runtime's supported document context and undo/transaction facilities where available; verify their exact behavior for the installed version. For baking, capture source-to-output mapping and avoid overwriting unrelated objects.
5. Verify and report
Compare before/after object counts, data-tree paths, geometry validity, units, tolerances, bounding boxes, exported file integrity, and sample element mappings. Separate successes, skipped items, and failures. Supply rollback steps and unresolved dependencies.
Deliverable
Return a compact Environment / Inputs / Invariants / Proposed graph or script / Safety and rollback / Verification / Unknowns plan. For reviews, prioritize silent data-tree changes, unit/tolerance drift, invalid geometry, plug-in/version assumptions, reference loss, and destructive bake/export operations.
Do not invent RhinoCommon API signatures, Grasshopper components, plug-in availability, or jurisdictional requirements. Verify version-specific behavior before prescribing executable code.
示例提示词
帮我搭一个Grasshopper参数化定义来生成这批幕墙单元。
所属插件
安装该插件会一并获得同领域的 44 个 Skill / MCP。
同插件的其他科研 Skill
- 建筑图纸矢量生成Produces coordinated architectural drawings (plans, sections, elevations, SVG/DXF) from structured specs with layer and standard checks. Use when drafting or generating drawing sets.
- 建筑项目全流程协调Coordinates end-to-end AEC work across briefing, design, BIM/CAD production, and handover by routing to specialist skills. Use for ambiguous or multi-discipline AEC tasks.
- 建筑任务书空间排布Converts briefs into traceable room programs, area schedules, adjacency logic, and requirement matrices. Use for space planning, briefing, or program validation.
- 建筑成果红队复核Independently challenges an architecture deliverable for hidden assumptions, coordination gaps, and unsupported claims before submission. Use for final adversarial review before issue.
- 建筑面积工程量核算Calculates and audits architectural areas, room schedules, quantities, and takeoffs with explicit units and measurement basis. Use for quantity reconciliation and takeoff sanity checks.
- AutoCAD DWG制图工作流Plans and reviews safe AutoCAD DWG workflows: layers, blocks, xrefs, layouts, plotting, and AutoLISP/.NET automation. Use for AutoCAD-specific drafting and DWG package preparation.
- BIM执行计划编制Drafts and reviews ISO 19650 BIM Execution Plans and Exchange Information Requirements: roles, CDE workflow, LOIN, and federation strategy. Use before modeling starts on a BIM-delivered project.
- 建筑围护结构性能设计Develops and reviews facade, roof, and foundation envelope strategies for thermal, water, air, and acoustic performance. Use for assembly design, condensation risk, and envelope QA.
- CAD/BIM自动化工作流Plans safe, least-destructive automation of CAD/BIM workflows such as batch edits and model-data extraction across Revit, IFC, DWG, and DXF. Use for repetitive model or document tasks.
- 建筑场地土木协调Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff.
- 建筑概念方案评审Critiques architectural concepts and compares design options against stated project goals across program, site, climate, and constructability. Use for design critique or option comparison.
- 建筑概念与方案设计Generates and develops concept and schematic design options (parti, massing, blocking, circulation, floor plans) from a validated brief. Use for early design option generation and comparison.
- 施工阶段行政管理支持Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout.
- 施工图文件集编制Develops and coordinates construction-document sets including sheet registers, schedules, details, and issue packages. Use for technical design production and permit or tender drawing sets.
- 土木项目成本管理Manages civil-engineering project budgets: contract sum, variation log, forecast final account, cashflow, and invoice register. Use for cost events such as variations, invoices, or budget review.
- 建筑造价与价值工程Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops.
- 项目文件发布核查Audits live civil-engineering project documents after a milestone to flag drift between proposed, contracted, and delivered work. Use after report issue or scope change to update project records.
- 建筑图纸质量检查QA checks architectural drawing sets for cross-sheet coordination, annotation, dimension, and revision issues. Use for reviewing PDFs, exported drawings, or issue sets before release.
- 岩土勘察与地基评估Plans and interprets geotechnical site investigations for foundation design: desk study, borehole/CPT interpretation, and bearing capacity checks. Use before foundation or earthworks design.
- 竣工移交与运维协调Coordinates architectural handover, O&M manuals, asset data, defects, and post-occupancy evaluation. Use from practical completion through building operation and facilities handoff.
- 历史建筑保护评估Researches heritage significance, listing status, and conservation constraints for existing buildings, and structures conservation-led options. Use for listed or historic buildings.
- 土木项目安全环保管理Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review.
- 室内装修布局设计Develops interior and fit-out layouts, furniture zoning, RCP concepts, finish strategies, and fit-out documentation. Use for workplace, residential, retail, or hospitality interior projects.
- 结构与无损检测根因调查Runs a systematic root-cause investigation protocol for structural and NDT findings before any remediation is proposed. Use when a defect, anomaly, or unexplained inspection finding is reported.
常见问题
Rhino参数化几何工作流能做什么?
Plans and reviews safe Rhino, Grasshopper, and RhinoCommon workflows including data trees and bake/export operations. Use for parametric AEC geometry pipelines and repeatable Rhino automation。
如何安装Rhino参数化几何工作流?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「Rhino参数化几何工作流」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
Rhino参数化几何工作流需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
Rhino参数化几何工作流经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。