Handover, FM & Post-Occupancy

Turn project information into an auditable owner/FM handover and feedback loop.

Preflight

  • Contract closeout requirements, asset information requirements, commissioning plan, O&M/warranty inputs, as-built models/drawings and FM system requirements.
  • Outstanding defects, training requirements, seasonal commissioning and post-occupancy goals.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Build a closeout deliverable matrix with owner, format, responsible party and acceptance status.
  2. Reconcile as-built drawings/models, asset tags, spaces/equipment, manuals, warranties and commissioning evidence.
  3. Track defects/punch closure and unresolved operational risks; do not mark complete from paperwork alone when physical verification is required.
  4. Plan user/FM training, seasonal review and post-occupancy evaluation; feed lessons back into project standards.

Deliverables

  • Handover/closeout matrix
  • Asset-information QA report
  • Defect/commissioning status
  • FM training and post-occupancy plan

Verification

  • Asset IDs, locations and documents cross-reference correctly and required files open in their target systems.
  • As-built status is based on verified records, not design intent alone.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not certify commissioning or practical completion outside the user's contractual authority.
  • Protect sensitive building/security and occupant data in handover datasets.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

示例提示词

项目要移交了,帮我整理竣工资料、保修信息和运维手册。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

竣工移交与运维协调能做什么?

Coordinates architectural handover, O&M manuals, asset data, defects, and post-occupancy evaluation. Use from practical completion through building operation and facilities handoff。

如何安装竣工移交与运维协调?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「竣工移交与运维协调」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

竣工移交与运维协调需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

竣工移交与运维协调经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。