Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops.

发布者 Codar安全审核通过v0.1.0更新于 2026-11-18

SKILL.md

Cost Planning & Value Engineering

Provide transparent estimates and option logic; keep professional quantity surveying/cost certification outside the skill.

Preflight

  • Area/quantity basis, design stage, location/currency/base date, procurement assumptions, inflation/escalation basis, allowances and exclusions.
  • Latest cost plan or benchmark sources and defined client budget.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Freeze a quantity/area baseline and map cost drivers to systems/elements rather than arbitrary percentages.
  2. Use sourced unit rates/ranges and state base date, currency, taxes/fees, contingency and escalation treatment.
  3. Compare options by cost delta plus performance/design/program consequences; avoid cost-only optimization.
  4. Track accepted/rejected VE items, design impacts and required drawing/spec changes.

Deliverables

  • Cost-plan assumptions sheet
  • Element/option cost matrix
  • VE register with consequences
  • Budget reconciliation and unknowns

Verification

  • Quantities reconcile with area/quantity audits and cost sources are dated/location-specific.
  • Ranges and uncertainty widen appropriately for earlier stages.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not present estimates as tenders, final accounts or professional QS certification.
  • Do not invent current market rates or contractor pricing.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

示例提示词

帮我比较这两个方案的工程量成本差异,做一次价值工程分析。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

建筑造价与价值工程能做什么?

Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops。

如何安装建筑造价与价值工程?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「建筑造价与价值工程」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

建筑造价与价值工程需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

建筑造价与价值工程经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。