科研 Skill

建筑场地土木协调

civil-site-design

Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff.

发布者 Codar安全审核通过v0.1.0更新于 2026-11-18

SKILL.md

Civil / Site Design Coordination

Develop and review site/civil concepts while keeping hydrology, road, geotechnical and utility engineering with qualified civil specialists.

Preflight

  • Topographic/cadastral survey, coordinate/datum system, existing/proposed surfaces, drainage catchments/outfalls, road/access requirements, utilities and geotechnical information.
  • Civil 3D version/workflow when applicable: surfaces, feature lines, alignments, profiles, corridors, pipe/pressure networks and data shortcuts.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Preserve survey control and build an existing-conditions/site-constraints model before proposed grading.
  2. Coordinate finished-floor levels, accessible entries, roads/parking, slopes, walls/steps and landscape interfaces against proposed surfaces.
  3. Map stormwater flow paths, utility corridors and service connections; expose conflicts with foundations, trees, public realm and structures.
  4. For Civil 3D work, inventory dynamic dependencies and data shortcuts before edits; validate surfaces, profiles, corridors and quantities after changes.

Deliverables

  • Site/civil coordination plan
  • Level/grading interface matrix
  • Drainage/utility corridor diagram
  • Civil 3D change/verification plan when relevant

Verification

  • Coordinates, datum, units, surface versions and level references are explicit.
  • Cut/fill, hydraulic capacity, pavement and retaining design are not treated as verified without engineering calculations.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not replace licensed civil, drainage, road or geotechnical design.
  • Never move survey control or authoritative utility data without explicit verified instruction.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

On-demand evidence and practice references

Load only the relevant reference. These are original review prompts, not binding code or full-book extraction.

示例提示词

帮我协调一下这个项目的场地竖向设计和雨水排放方案。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

建筑场地土木协调能做什么?

Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff。

如何安装建筑场地土木协调?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「建筑场地土木协调」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

建筑场地土木协调需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

建筑场地土木协调经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。