Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout.

发布者 Codar安全审核通过v0.1.0更新于 2026-11-18

SKILL.md

Construction Administration

Maintain a factual project record and route contractual/legal determinations to the responsible professional.

Preflight

  • Contract/delivery context, issued drawing/spec revision, RFI/submittal/change logs, meeting/site records and defined architect authority.
  • Response deadlines, responsible parties and whether the item affects cost/time/design/safety.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Classify incoming item, link it to contract/issued information and identify affected disciplines/drawings/specs.
  2. Draft concise response or review comments that answer only within the architect's authority; distinguish clarification from design change.
  3. Track status, responsible party, dates, superseded information and downstream drawing/model/spec updates.
  4. For site observations/punch lists, record location, evidence, required action and verification status without asserting unseen conditions.

Deliverables

  • RFI response draft
  • Submittal/shop-drawing review comments
  • Change/decision log
  • Site observation or punch-list record
  • Closeout/as-built action list

Verification

  • Every response references the correct current issue/revision and does not conflict with prior decisions.
  • Changes propagate to affected documentation and responsibility/status remain visible.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not give legal advice, certify payment, accept nonconforming work, direct contractor means/methods, or make safety determinations outside the user's authority.
  • Urgent life-safety/site hazards must be escalated to responsible professionals.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

示例提示词

帮我整理一下这批RFI和送审资料的处理状态和现场记录。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

施工阶段行政管理支持能做什么?

Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout。

如何安装施工阶段行政管理支持?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「施工阶段行政管理支持」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

施工阶段行政管理支持需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

施工阶段行政管理支持经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。