Construction Documentation

Turn coordinated design information into a traceable drawing/document package without inventing technical details.

Preflight

  • Project stage, issue purpose, sheet/document numbering standard, units, scales, revision system and consultant deliverables.
  • Current architectural model/drawings, room/door/window/finish data, outline specifications and known coordination decisions.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Build a deliverable/sheet register and responsibility matrix before producing sheets.
  2. Develop general arrangements first, then sections/elevations, enlarged plans and details; keep tags/references bidirectional.
  3. Generate schedules from authoritative model/data where possible; reconcile IDs and counts against plans.
  4. Run cross-sheet, revision, annotation, dimension and consultant-interface QA before issue; freeze the issue snapshot and record transmittal metadata.

Deliverables

  • Sheet/document register
  • Coordinated drawing package plan
  • Schedules and detail register
  • Issue checklist and transmittal metadata

Verification

  • Every callout resolves; room/door/window/detail identifiers reconcile across views and schedules.
  • Revision/date/status are consistent and the issue package opens/plots at intended scales.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not invent missing construction assemblies or engineering details.
  • Issue status does not equal code compliance or professional approval.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

示例提示词

帮我把这些平立剖图纸整理成一套完整的施工图出图清单。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

施工图文件集编制能做什么?

Develops and coordinates construction-document sets including sheet registers, schedules, details, and issue packages. Use for technical design production and permit or tender drawing sets。

如何安装施工图文件集编制?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「施工图文件集编制」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

施工图文件集编制需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

施工图文件集编制经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。