科研 Skill
CAD/BIM自动化工作流
cad-bim-automation
Plans safe, least-destructive automation of CAD/BIM workflows such as batch edits and model-data extraction across Revit, IFC, DWG, and DXF. Use for repetitive model or document tasks.
SKILL.md
CAD/BIM Automation
Inspect formats/versions, available tools/APIs, source-vs-issued status, units, coordinates/origin, levels/grids, layers/categories, naming, and revisions.
Choose the least destructive method: read/report → export to new file → supported API/script → original edit only with explicit permission. For proprietary formats, produce an application-native workflow rather than pretending an unsupported direct edit occurred.
Batch protocol: inventory → dry run → sample → validate → full run → post-change audit.
Verify counts, units, geometry bounds, naming, missing objects/categories, export integrity, and deltas. Never alter surveyed coordinates, structural geometry, life-safety elements, or issued information outside explicit scope and review.
Opt-in local Blender prototype (separately installed skill): if a trusted Blender executable is available and the user requests a NEW conceptual 3D scene, discover the installed architectural-drawing-generation skill first. Its own scripts/blender_native.py (worker and validator included) is the portable entry point; run doctor, then build SPEC.json NEW_OUT from that skill directory. Do not assume the standalone cad-bim-automation skill contains Blender code or repo docs. In a Gridline checkout, scripts/blender_native.py is merely a convenience launcher; docs/BLENDER_NATIVE_BRIDGE.md documents its limits. If the drawing skill is absent, report a missing dependency rather than inventing a path. This bridge creates editable conceptual mesh geometry and .glb with native readback; it cannot edit live models, install MCPs, reconstruct images, establish IFC/AutoCAD compliance or approve drawings. Ask for missing reference measurements and report unsupported details.
Optional signed source workflow: the drawing skill also supplies
component_state.py for typed component/level/wall/opening/room proposals, exact
Ed25519 owner approvals, immutable revisions, indexed impacts, stale conflicts,
revalidated disjoint merges and approved restore. Keep owner keys outside the
agent and never self-sign as a real owner. archimesh_components.py build --state-db DB --owner-key-sha256 PIN requires the signed current source and new output only;
component_ifc.py additionally requires the state database, requirements and
trusted source/owner pins. These source/file operations do not authorize live
Revit/AutoCAD writes, replace native transactions/rollback, establish a complete
external drawing dependency graph or close the general #15 gate. Read the drawing
skill's actual commands/limits; do not assume this standalone automation skill
contains its scripts.
示例提示词
帮我写一个脚本批量从这批Revit模型里导出房间数据。
所属插件
安装该插件会一并获得同领域的 44 个 Skill / MCP。
同插件的其他科研 Skill
- 建筑图纸矢量生成Produces coordinated architectural drawings (plans, sections, elevations, SVG/DXF) from structured specs with layer and standard checks. Use when drafting or generating drawing sets.
- 建筑项目全流程协调Coordinates end-to-end AEC work across briefing, design, BIM/CAD production, and handover by routing to specialist skills. Use for ambiguous or multi-discipline AEC tasks.
- 建筑任务书空间排布Converts briefs into traceable room programs, area schedules, adjacency logic, and requirement matrices. Use for space planning, briefing, or program validation.
- 建筑成果红队复核Independently challenges an architecture deliverable for hidden assumptions, coordination gaps, and unsupported claims before submission. Use for final adversarial review before issue.
- 建筑面积工程量核算Calculates and audits architectural areas, room schedules, quantities, and takeoffs with explicit units and measurement basis. Use for quantity reconciliation and takeoff sanity checks.
- AutoCAD DWG制图工作流Plans and reviews safe AutoCAD DWG workflows: layers, blocks, xrefs, layouts, plotting, and AutoLISP/.NET automation. Use for AutoCAD-specific drafting and DWG package preparation.
- BIM执行计划编制Drafts and reviews ISO 19650 BIM Execution Plans and Exchange Information Requirements: roles, CDE workflow, LOIN, and federation strategy. Use before modeling starts on a BIM-delivered project.
- 建筑围护结构性能设计Develops and reviews facade, roof, and foundation envelope strategies for thermal, water, air, and acoustic performance. Use for assembly design, condensation risk, and envelope QA.
- 建筑场地土木协调Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff.
- 建筑概念方案评审Critiques architectural concepts and compares design options against stated project goals across program, site, climate, and constructability. Use for design critique or option comparison.
- 建筑概念与方案设计Generates and develops concept and schematic design options (parti, massing, blocking, circulation, floor plans) from a validated brief. Use for early design option generation and comparison.
- 施工阶段行政管理支持Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout.
- 施工图文件集编制Develops and coordinates construction-document sets including sheet registers, schedules, details, and issue packages. Use for technical design production and permit or tender drawing sets.
- 土木项目成本管理Manages civil-engineering project budgets: contract sum, variation log, forecast final account, cashflow, and invoice register. Use for cost events such as variations, invoices, or budget review.
- 建筑造价与价值工程Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops.
- 项目文件发布核查Audits live civil-engineering project documents after a milestone to flag drift between proposed, contracted, and delivered work. Use after report issue or scope change to update project records.
- 建筑图纸质量检查QA checks architectural drawing sets for cross-sheet coordination, annotation, dimension, and revision issues. Use for reviewing PDFs, exported drawings, or issue sets before release.
- 岩土勘察与地基评估Plans and interprets geotechnical site investigations for foundation design: desk study, borehole/CPT interpretation, and bearing capacity checks. Use before foundation or earthworks design.
- 竣工移交与运维协调Coordinates architectural handover, O&M manuals, asset data, defects, and post-occupancy evaluation. Use from practical completion through building operation and facilities handoff.
- 历史建筑保护评估Researches heritage significance, listing status, and conservation constraints for existing buildings, and structures conservation-led options. Use for listed or historic buildings.
- 土木项目安全环保管理Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review.
- 室内装修布局设计Develops interior and fit-out layouts, furniture zoning, RCP concepts, finish strategies, and fit-out documentation. Use for workplace, residential, retail, or hospitality interior projects.
- 结构与无损检测根因调查Runs a systematic root-cause investigation protocol for structural and NDT findings before any remediation is proposed. Use when a defect, anomaly, or unexplained inspection finding is reported.
- 建筑生命安全与无障碍设计Coordinates life-safety and accessibility design using jurisdiction-specific requirements: egress, fire compartmentation, and accessible routes. Use for code-review matrices and egress studies.
常见问题
CAD/BIM自动化工作流能做什么?
Plans safe, least-destructive automation of CAD/BIM workflows such as batch edits and model-data extraction across Revit, IFC, DWG, and DXF. Use for repetitive model or document tasks。
如何安装CAD/BIM自动化工作流?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「CAD/BIM自动化工作流」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
CAD/BIM自动化工作流需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
CAD/BIM自动化工作流经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。