Audits live civil-engineering project documents after a milestone to flag drift between proposed, contracted, and delivered work. Use after report issue or scope change to update project records.
SKILL.md
Document Release
Post-delivery document currency audit for [Your Organisation]. Scans all live project documents after a milestone issue and flags any that have drifted from the actual scope, findings, or programme.
Adapted from the gstack /document-release methodology for the firm
engineering practice.
RULE: Every issued report or milestone creates a document debt — the gap between what the project file says and what actually happened. This skill clears that debt before it compounds into a contractual or professional liability.
When to Run
Run after any of these events:
| Event | Why Docs Drift |
|---|---|
| Final report issued | Findings may differ from method statement; scope exclusions may have changed |
| Interim / preliminary report issued | Programme, scope, and fee records need to reflect partial delivery |
| Variation order agreed | Contract, proposal scope, and programme all need updating |
| Scope reduced (client decision) | Deliverable register, fee schedule, and programme need to reflect reduction |
| Inspection completed (but report pending) | Field data may have revealed conditions not anticipated in the method statement |
| Project paused or suspended | Status must be recorded in all documents before file is archived |
| Project handed over to another engineer | Every document must reflect current state for continuity |
Phase 1 — Document Inventory
List all live project documents. For each project, the standard set is:
| Document | Ref | Status |
|---|---|---|
| Proposal | PRJ/PROP/YYYY/NNN | [current / stale / superseded] |
| Contract / LOA | PRJ/CON/YYYY/NNN | [current / stale / superseded] |
| Method Statement | PRJ/MS/YYYY/NNN | [current / stale / not produced] |
| Programme / Schedule | — | [current / stale / not produced] |
| Transmittal Register | PRJ/LTR/YYYY/NNN | [current / stale / not produced] |
| Deliverable Register | — | [current / stale / not produced] |
| Field Data Records | — | [filed / unfiled / missing] |
| Final Report(s) | PRJ/RPT/YYYY/NNN | [issued / draft / pending] |
| Invoice Record | — | [current / outstanding items] |
Flag any document that is absent and should exist for this project type.
Phase 2 — Drift Detection
For each document in the inventory, check for drift against the current project reality.
2.1 Scope Drift
Compare the scope of work as stated in:
- The proposal (what the firm offered to do)
- The contract (what the firm was contracted to do)
- The issued report (what the firm actually did)
Flag any discrepancy:
SCOPE DRIFT FLAG:
Document: [name and ref]
Stated scope: [what the document says]
Actual delivery: [what was actually done]
Drift type: [ADDITION / OMISSION / SUBSTITUTION]
Action required: [update document / issue variation record / note in retro]
2.2 Findings Drift
Compare the findings, recommendations, or conclusions in:
- The method statement (what the firm expected to find / how results would be reported)
- The issued report (what the firm actually found)
Flag if:
- The report contains findings not anticipated in the method statement (new defect types, access restrictions, additional elements inspected)
- The acceptance criteria applied differ from those stated in the method statement
2.3 Programme Drift
Compare:
- Proposed programme dates
- Actual mobilisation, inspection, and report issue dates
Flag if actual dates differ from proposed by more than 14 days, and record the reason (client delay, the firm delay, external).
2.4 Fee Drift
Compare:
- Contract fee (as executed)
- Any variations agreed (verbal or written)
- Invoices issued to date
Flag any uncontracted work performed but not invoiced, or any agreed variation without a formal variation order.
Phase 3 — Update Actions
For each drift flag, assign one of these actions:
| Action | When to Use |
|---|---|
| AMEND — update the document | Factual error, administrative correction, minor addition |
| ISSUE VARIATION RECORD — create a brief variation note | Scope addition or change agreed with client but not formally documented |
| NOTE IN RETRO — log in the project retrospective notes but do not amend | Informational drift that doesn't affect contract or liability |
| ESCALATE — requires client discussion before any document change | Disputed scope, contradictory client instructions, potential claim |
| NO ACTION — drift is acceptable and documented | Deliberate deviation with client knowledge |
Produce an action list:
DOCUMENT UPDATE ACTION LIST:
Project: [name]
Date: [date]
1. [document ref] — [AMEND / VARIATION RECORD / RETRO NOTE / ESCALATE / NO ACTION]
Reason: [one line]
Owner: [PM]
Due: [date]
2. [document ref] — [action]
...
Phase 4 — Transmittal Register Update
After every report or document issue, the transmittal register must reflect:
| Field | Confirm |
|---|---|
| Document title correct | [ ] |
| Document reference correct | [ ] |
| Revision number updated | [ ] |
| Issue date recorded | [ ] |
| Recipient confirmed | [ ] |
| Method of transmission recorded (email / portal / hand) | [ ] |
| Client acknowledgement / receipt recorded (if required) | [ ] |
If the transmittal register does not exist for this project, create it now using the project's standard document template or an available document-drafting tool.
Phase 5 — Archive Check
Before closing a project file:
- All field data (photos, raw NDT readings, calibration records) filed in the project folder with legible naming convention
- All client communications (emails, meeting notes, instructions) filed
- Final report in PDF/A format for long-term archiving
- Equipment calibration certificates for the inspection period filed (these support the report's legal validity)
- Any [National Regulator] or regulatory submission receipts filed
- Invoice and payment records reconciled
Output — Document Release Note
PM DOCUMENT RELEASE NOTE
Ref: PRJ/DRN/[YYYY]/[NNN]
Date: [date]
Project: [name]
Client: [name]
Trigger event: [what just happened — report issued, variation agreed, etc.]
DOCUMENTS REVIEWED: [N]
DRIFT FLAGS RAISED: [N]
ACTIONS ASSIGNED: [N]
OPEN ACTIONS:
[list from Phase 3]
ARCHIVE STATUS: [COMPLETE / INCOMPLETE — items outstanding]
Prepared by: [PM]
File this note in the project folder alongside the documents it covers.
示例提示词
报告刚发出去,帮我核查一下所有在用文件是否反映实际交付内容。
所属插件
安装该插件会一并获得同领域的 44 个 Skill / MCP。
同插件的其他科研 Skill
- 建筑图纸矢量生成Produces coordinated architectural drawings (plans, sections, elevations, SVG/DXF) from structured specs with layer and standard checks. Use when drafting or generating drawing sets.
- 建筑项目全流程协调Coordinates end-to-end AEC work across briefing, design, BIM/CAD production, and handover by routing to specialist skills. Use for ambiguous or multi-discipline AEC tasks.
- 建筑任务书空间排布Converts briefs into traceable room programs, area schedules, adjacency logic, and requirement matrices. Use for space planning, briefing, or program validation.
- 建筑成果红队复核Independently challenges an architecture deliverable for hidden assumptions, coordination gaps, and unsupported claims before submission. Use for final adversarial review before issue.
- 建筑面积工程量核算Calculates and audits architectural areas, room schedules, quantities, and takeoffs with explicit units and measurement basis. Use for quantity reconciliation and takeoff sanity checks.
- AutoCAD DWG制图工作流Plans and reviews safe AutoCAD DWG workflows: layers, blocks, xrefs, layouts, plotting, and AutoLISP/.NET automation. Use for AutoCAD-specific drafting and DWG package preparation.
- BIM执行计划编制Drafts and reviews ISO 19650 BIM Execution Plans and Exchange Information Requirements: roles, CDE workflow, LOIN, and federation strategy. Use before modeling starts on a BIM-delivered project.
- 建筑围护结构性能设计Develops and reviews facade, roof, and foundation envelope strategies for thermal, water, air, and acoustic performance. Use for assembly design, condensation risk, and envelope QA.
- CAD/BIM自动化工作流Plans safe, least-destructive automation of CAD/BIM workflows such as batch edits and model-data extraction across Revit, IFC, DWG, and DXF. Use for repetitive model or document tasks.
- 建筑场地土木协调Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff.
- 建筑概念方案评审Critiques architectural concepts and compares design options against stated project goals across program, site, climate, and constructability. Use for design critique or option comparison.
- 建筑概念与方案设计Generates and develops concept and schematic design options (parti, massing, blocking, circulation, floor plans) from a validated brief. Use for early design option generation and comparison.
- 施工阶段行政管理支持Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout.
- 施工图文件集编制Develops and coordinates construction-document sets including sheet registers, schedules, details, and issue packages. Use for technical design production and permit or tender drawing sets.
- 土木项目成本管理Manages civil-engineering project budgets: contract sum, variation log, forecast final account, cashflow, and invoice register. Use for cost events such as variations, invoices, or budget review.
- 建筑造价与价值工程Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops.
- 建筑图纸质量检查QA checks architectural drawing sets for cross-sheet coordination, annotation, dimension, and revision issues. Use for reviewing PDFs, exported drawings, or issue sets before release.
- 岩土勘察与地基评估Plans and interprets geotechnical site investigations for foundation design: desk study, borehole/CPT interpretation, and bearing capacity checks. Use before foundation or earthworks design.
- 竣工移交与运维协调Coordinates architectural handover, O&M manuals, asset data, defects, and post-occupancy evaluation. Use from practical completion through building operation and facilities handoff.
- 历史建筑保护评估Researches heritage significance, listing status, and conservation constraints for existing buildings, and structures conservation-led options. Use for listed or historic buildings.
- 土木项目安全环保管理Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review.
- 室内装修布局设计Develops interior and fit-out layouts, furniture zoning, RCP concepts, finish strategies, and fit-out documentation. Use for workplace, residential, retail, or hospitality interior projects.
- 结构与无损检测根因调查Runs a systematic root-cause investigation protocol for structural and NDT findings before any remediation is proposed. Use when a defect, anomaly, or unexplained inspection finding is reported.
- 建筑生命安全与无障碍设计Coordinates life-safety and accessibility design using jurisdiction-specific requirements: egress, fire compartmentation, and accessible routes. Use for code-review matrices and egress studies.
常见问题
项目文件发布核查能做什么?
Audits live civil-engineering project documents after a milestone to flag drift between proposed, contracted, and delivered work. Use after report issue or scope change to update project records。
如何安装项目文件发布核查?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「项目文件发布核查」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
项目文件发布核查需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
项目文件发布核查经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。