hse

Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review.

发布者 Codar安全审核通过v0.1.0更新于 2026-11-18

SKILL.md

PM HSE

Health, safety, and environment management for civil engineering projects. Safety plan → method statement review → incident management → statutory reporting.

RULE: Any incident with injury, fatality, or environmental release is an IMMEDIATE escalation to [PM]. No communication to regulators or client before [PM] has reviewed the facts.


HSE Plan Essentials

Set up at project start. Minimum required elements:

ElementStatus
Project HSE Plan (site-specific)[ ] Prepared / [ ] Client approved
Emergency Response Plan[ ] Prepared
Site-specific risk assessment[ ] Prepared
First Aid provisions confirmed[ ]
PPE requirements defined[ ]
Site induction programme[ ] Prepared
Method statements for high-risk activities[ ] Identified / [ ] Prepared
Environmental controls (waste, water, noise)[ ] Identified
Regulatory notifications (if applicable)[ ] Filed

High-Risk Activity Method Statements

These activities require a written Method Statement and Risk Assessment (MSRA) before work commences. Flag any that apply to this project:

  • Excavation > 1.2m depth
  • Formwork and falsework
  • Working at height (> 2m)
  • Crane and lifting operations
  • Confined space entry
  • Demolition works
  • Electrical isolation (LV or HV)
  • Hot work (welding, cutting, grinding)
  • Hazardous materials handling (asbestos, lead paint, fuel)
  • Piling operations

For each applicable activity:

MSRA RECORD
  Activity: [description]
  MSRA prepared: [yes/no — date]
  MSRA reviewed by PM: [yes/no — date]
  MSRA approved by client: [yes/no — date, if required]
  Toolbox talk conducted: [yes/no — date, attendees]
  Permit to work required: [yes/no — permit type]

Incident Classification

ClassDescriptionImmediate action
FATALITYDeath on site or caused by site activitySTOP ALL WORK. [PM] + client within 1 hour. Regulator within 24 hours. Preserve scene.
SERIOUS INJURYLost time injury, hospitalisation, permanent disabilitySTOP affected work. [PM] + client same day. Regulator as required.
MINOR INJURYFirst aid treatment, no lost timeFirst aid administered, logged, reported to site manager
NEAR-MISSPotential for injury but no injury occurredInvestigate within 24 hours — near-misses predict future incidents
UNSAFE CONDITIONHazard identified before incidentCorrect immediately or isolate. Log and report.
ENVIRONMENTALSpill, discharge, noise/dust exceedanceContain, report to PM, notify client and regulator as required

Incident Record

INCIDENT RECORD
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━
ID:               INC-[NNN]
Date/time:        [date and time]
Location:         [WBS ref + physical description]
Class:            [FATALITY / SERIOUS INJURY / MINOR INJURY / NEAR-MISS /
                   UNSAFE CONDITION / ENVIRONMENTAL]
Persons involved: [name, role, contractor — anonymise for external reports]
Description:      [what happened — factual, no blame language]
Immediate action taken: [first aid, area isolated, equipment stopped, etc.]

Root cause investigation:
  Route to investigate for all SERIOUS INJURY, FATALITY, and NEAR-MISS

Contributing factors: [after investigation]
Corrective action: [specific, owner, date]
Preventive action: [systemic change to prevent recurrence]

Statutory reporting required: [yes/no — which body — deadline]
Client notification required: [yes/no — deadline]
Reported by: [name]
Report date: [date]
━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━━

Statutory Reporting (Nigeria context)

EventReporting bodyTimeline
Fatality[National Regulator] (if oil & gas) / State OSHE agency24 hours
Serious injury (hospitalisation)Employer / insurance / state agency7 days
Environmental release (oil & gas)[National Regulator] / NOSDRAImmediate notification
Environmental release (civil)NESREA / state EPA24 hours
Structural collapseCOREN / state regulator24 hours

Require explicit [PM] sign-off before any statutory notification is submitted.


Toolbox Talk Register

Weekly minimum. Log:

DateTopicConducted byAttendees (N)Sign-off sheet filed

HSE Summary (for report)

HSE SUMMARY FOR REPORT:
  Incidents this period:      FATALITY [N]  SERIOUS [N]  MINOR [N]
  Near-misses this period:    [N]
  Unsafe conditions reported: [N resolved / N open]
  Lost Time Injury (LTI):     [N]
  LTI Frequency Rate (LTIFR): [if tracked — (LTIs × 200,000) / man-hours]
  Toolbox talks conducted:    [N]
  Method statements approved: [N]
  Open HSE actions:           [N]

示例提示词

现场发生了一起未遂事故,帮我记录并更新安全管理台账。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

土木项目安全环保管理能做什么?

Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review。

如何安装土木项目安全环保管理?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「土木项目安全环保管理」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

土木项目安全环保管理需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

土木项目安全环保管理经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。