Geotechnical Site Investigation
Establish ground conditions before any foundation, retaining structure, slab-on-grade, or earthworks design proceeds. Geotechnical interpretation is advisory research support; it does not replace a licensed geotechnical engineer's sign-off.
Prerequisites
- A defined site location, proposed structure type/loads, and site boundary.
- Access to a geotechnical consultant's factual report, or a clear scope for commissioning one.
- Basic familiarity with soil mechanics terms (bearing capacity, settlement, groundwater, plasticity index) is assumed; this skill explains how to apply them, not first principles.
Preflight
Record before analysis:
- Site location, regional geology, known hazards (karst, mining legacy, made ground, liquefaction potential, expansive clay, landslide susceptibility).
- Proposed structure: type, approximate column/wall loads, foundation depth options, basement levels, and sensitivity to settlement (e.g. machinery vs. simple frame).
- Existing information: previous site investigations, adjacent-site borehole logs, geological survey maps, historical land-use records (industrial, landfill, mining).
- Groundwater regime: expected water table, seasonal variation, perched water risk.
Leave unknown values as UNKNOWN. Never assume a greenfield site is free of
contamination or made ground without checking historical land-use records.
Workflow
1. Desk study
Before any intrusive investigation, compile:
- Geological survey sheets/maps for the area (national geological survey where available, e.g. British Geological Survey, USGS, or the relevant national equivalent).
- Historical maps and aerial photography to identify former land use, filled ground, quarries, or demolished structures.
- Known flood zone, seismic zone, and radon/gas risk classification for the area.
- Any existing boreholes within or near the site from public geotechnical databases or prior projects.
Produce a desk-study risk register: each identified hazard, its likely impact on foundation design, and whether it requires confirmation by intrusive investigation.
2. Scope the ground investigation
Define, with the structure's sensitivity and the desk-study risks in mind:
- Investigation method: trial pits (shallow, cheap, visual logging), boreholes with standard penetration test (SPT), cone penetration test (CPT), or a combination.
- Number and spacing of investigation points, tied to footprint size and ground variability — more points where fill, slopes, or made ground are suspected.
- Depth of investigation: typically to at least 1.5–2x the anticipated foundation width below founding level, deeper for piled foundations or where compressible strata are suspected.
- Laboratory testing schedule: particle size distribution, Atterberg limits, moisture content, triaxial/consolidation tests, chemical testing (sulfate, pH, chloride) for concrete aggressivity, and contamination screening if the desk study flags a risk.
- In-situ testing: standpipe or piezometer installation for groundwater monitoring where the water table is uncertain or seasonal variation matters.
State the investigation scope as a deliverable others can commission or review, not as a substitute for the intrusive works themselves.
3. Interpret borehole/CPT logs
When factual logs are provided:
- Build a simplified ground model: stratum boundaries, descriptions (consistency, density, plasticity), and depth ranges across all investigation points.
- Flag inconsistent strata between adjacent points — this may indicate a geological boundary, made ground pocket, or a logging discrepancy requiring clarification.
- Extract SPT N-values or CPT cone resistance (qc) and sleeve friction (fs) profiles; note where correlations (N-to-friction-angle, qc-to-undrained-shear-strength) are being used, since these are empirical and region/soil-type dependent.
- Record groundwater strikes and any standing water level after installation — distinguish a perched water strike from the true water table.
4. Preliminary bearing capacity and settlement check
Using standard methods (e.g. Terzaghi/Meyerhof bearing capacity equations, or settlement estimates from SPT/CPT correlations):
- State which method and correlation set is used, and that results are indicative pending the geotechnical engineer's detailed calculation.
- Compare proposed foundation bearing pressure against the indicative allowable bearing capacity with an appropriate factor of safety (commonly 2.5–3 for shallow foundations, but defer to project-specific code and engineer input).
- Flag settlement-sensitive structures (machine foundations, structures with low tolerance for differential settlement) for more detailed analysis regardless of bearing capacity outcome.
- Never present a bearing capacity or settlement number as a design value; present it as a preliminary indication requiring sign-off.
5. Foundation strategy options
Translate ground conditions into foundation options for the design team:
- Shallow foundations (pad, strip, raft) where competent strata are near surface and settlement is acceptable.
- Deep foundations (driven or bored piles, CFA piles) where competent strata are deep, loads are high, or settlement tolerance is low.
- Ground improvement options (vibro compaction, dynamic compaction, preloading) where marginal ground could otherwise be improved rather than bypassed.
- State the cost, programme, and risk trade-offs of each option at a strategic level; detailed design remains with the geotechnical/structural engineer.
Deliverables
- Desk-study hazard register
- Ground investigation scope (points, depths, tests)
- Simplified ground model and groundwater summary
- Preliminary bearing capacity / settlement indication with stated method and confidence
- Foundation strategy options with trade-offs
Verification
- Every numeric value (N-value, qc, bearing pressure, water level) is traceable to a specific log, depth, and source document.
- Correlations and factors of safety used are named explicitly, not presented as universal constants.
- Any extrapolation between investigation points is flagged as interpretation, not fact.
Professional boundaries
- This skill does not replace a geotechnical engineer's signed report, a structural engineer's foundation design, or an environmental consultant's contamination assessment. Treat all outputs as inputs to those professionals' work.
- Never certify ground conditions as suitable for construction; always flag unconfirmed hazards (contamination, unexploded ordnance, mining legacy, karst, expansive soils) for specialist investigation before design proceeds.
- Regional practice varies significantly: bearing capacity factors of safety, standard penetration test correction methods, and permissible settlement criteria differ by country/code (e.g. Eurocode 7, IS codes, local practice). Always confirm the governing code for the project's jurisdiction before applying numeric criteria.
Limitations
- This skill works from provided or published data; it does not perform or supervise physical fieldwork, drilling, or laboratory testing.
- Empirical correlations (SPT-to-friction-angle, CPT-to-strength) carry significant uncertainty and are soil-type and region dependent; treat derived parameters as indicative only.
- Does not cover seismic site response analysis, liquefaction triggering assessment, or slope-stability analysis in detail — these require specialist geotechnical software and a qualified engineer's sign-off.
- Contamination and environmental risk screening here is a desk-study flag only, not a Phase I/II environmental site assessment.
示例提示词
帮我根据这些钻孔资料初步判断地基承载力和基础方案选型。
所属插件
安装该插件会一并获得同领域的 44 个 Skill / MCP。
同插件的其他科研 Skill
- 建筑图纸矢量生成Produces coordinated architectural drawings (plans, sections, elevations, SVG/DXF) from structured specs with layer and standard checks. Use when drafting or generating drawing sets.
- 建筑项目全流程协调Coordinates end-to-end AEC work across briefing, design, BIM/CAD production, and handover by routing to specialist skills. Use for ambiguous or multi-discipline AEC tasks.
- 建筑任务书空间排布Converts briefs into traceable room programs, area schedules, adjacency logic, and requirement matrices. Use for space planning, briefing, or program validation.
- 建筑成果红队复核Independently challenges an architecture deliverable for hidden assumptions, coordination gaps, and unsupported claims before submission. Use for final adversarial review before issue.
- 建筑面积工程量核算Calculates and audits architectural areas, room schedules, quantities, and takeoffs with explicit units and measurement basis. Use for quantity reconciliation and takeoff sanity checks.
- AutoCAD DWG制图工作流Plans and reviews safe AutoCAD DWG workflows: layers, blocks, xrefs, layouts, plotting, and AutoLISP/.NET automation. Use for AutoCAD-specific drafting and DWG package preparation.
- BIM执行计划编制Drafts and reviews ISO 19650 BIM Execution Plans and Exchange Information Requirements: roles, CDE workflow, LOIN, and federation strategy. Use before modeling starts on a BIM-delivered project.
- 建筑围护结构性能设计Develops and reviews facade, roof, and foundation envelope strategies for thermal, water, air, and acoustic performance. Use for assembly design, condensation risk, and envelope QA.
- CAD/BIM自动化工作流Plans safe, least-destructive automation of CAD/BIM workflows such as batch edits and model-data extraction across Revit, IFC, DWG, and DXF. Use for repetitive model or document tasks.
- 建筑场地土木协调Coordinates architecture with civil/site engineering: grading, earthworks, access, drainage, utilities, and Civil 3D workflows. Use for site grading concepts and civil-architectural handoff.
- 建筑概念方案评审Critiques architectural concepts and compares design options against stated project goals across program, site, climate, and constructability. Use for design critique or option comparison.
- 建筑概念与方案设计Generates and develops concept and schematic design options (parti, massing, blocking, circulation, floor plans) from a validated brief. Use for early design option generation and comparison.
- 施工阶段行政管理支持Supports construction-phase administration: RFIs, submittals, site observations, change tracking, and punch lists. Use during tender clarification, construction, and closeout.
- 施工图文件集编制Develops and coordinates construction-document sets including sheet registers, schedules, details, and issue packages. Use for technical design production and permit or tender drawing sets.
- 土木项目成本管理Manages civil-engineering project budgets: contract sum, variation log, forecast final account, cashflow, and invoice register. Use for cost events such as variations, invoices, or budget review.
- 建筑造价与价值工程Supports architectural cost planning, option comparison, and value engineering using traceable quantities and cost sources. Use for early cost plans, budget reconciliation, and VE workshops.
- 项目文件发布核查Audits live civil-engineering project documents after a milestone to flag drift between proposed, contracted, and delivered work. Use after report issue or scope change to update project records.
- 建筑图纸质量检查QA checks architectural drawing sets for cross-sheet coordination, annotation, dimension, and revision issues. Use for reviewing PDFs, exported drawings, or issue sets before release.
- 竣工移交与运维协调Coordinates architectural handover, O&M manuals, asset data, defects, and post-occupancy evaluation. Use from practical completion through building operation and facilities handoff.
- 历史建筑保护评估Researches heritage significance, listing status, and conservation constraints for existing buildings, and structures conservation-led options. Use for listed or historic buildings.
- 土木项目安全环保管理Manages civil-engineering health, safety, and environment: safety plans, incident register, method statement review, and statutory reporting. Use for any HSE incident, near-miss, or safety review.
- 室内装修布局设计Develops interior and fit-out layouts, furniture zoning, RCP concepts, finish strategies, and fit-out documentation. Use for workplace, residential, retail, or hospitality interior projects.
- 结构与无损检测根因调查Runs a systematic root-cause investigation protocol for structural and NDT findings before any remediation is proposed. Use when a defect, anomaly, or unexplained inspection finding is reported.
- 建筑生命安全与无障碍设计Coordinates life-safety and accessibility design using jurisdiction-specific requirements: egress, fire compartmentation, and accessible routes. Use for code-review matrices and egress studies.
常见问题
岩土勘察与地基评估能做什么?
Plans and interprets geotechnical site investigations for foundation design: desk study, borehole/CPT interpretation, and bearing capacity checks. Use before foundation or earthworks design。
如何安装岩土勘察与地基评估?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「岩土勘察与地基评估」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
岩土勘察与地基评估需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
岩土勘察与地基评估经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。