MEP / Building Services Coordination

Protect spatial allowances, access and architectural intent while routing discipline calculations to qualified engineers.

Preflight

  • Available MEP/fire drawings/models, equipment schedules, plant/shaft requirements, ceiling zones, structural constraints and maintenance/replacement routes.
  • Rooms with special environmental, plumbing, power, data, ventilation or acoustic needs.

Keep verified facts, project assumptions, design options, and unresolved questions visibly separate. If a required input is absent, record it as UNKNOWN rather than inventing it.

Workflow

  1. Build a services-zone map by level and identify shafts/risers/plant rooms and major horizontal routes.
  2. Overlay services with structure, ceilings, facade, partitions, lighting and circulation; prioritize hard constraints and maintenance access.
  3. Track openings/penetrations and builder-work items with ownership/status.
  4. Resolve clashes through explicit option tradeoffs and record engineer-approved decisions.

Deliverables

  • MEP spatial allowance matrix
  • Shaft/plant/ceiling-zone coordination diagrams
  • Penetration/builder-work register
  • Clash/decision log

Verification

  • Vertical risers align, equipment access is preserved and coordination changes propagate to plans/sections/RCPs.
  • No airflow, electrical, hydraulic or fire-protection performance is assumed without engineer evidence.

For file/model changes, compare the result against a pre-change baseline and report changed items, skipped items, failures, and checks actually run.

Professional boundaries

  • Do not perform final MEP design or certify system performance.
  • Maintainability, commissioning and life-safety requirements need discipline review.

If a live CAD/BIM/GIS/analysis tool or MCP integration is available, inspect the current document/model and tool version before write operations. Prefer read-only inspection, dry runs, bounded samples, new output paths, and native undo/transaction mechanisms. Never claim a model or drawing was changed unless the tool confirms it.

If the native application is unavailable, produce a reproducible plan, script, structured data, SVG/DXF artifact, or exact in-application procedure instead of pretending to have operated the software.

示例提示词

帮我协调一下设备机房和管井的空间预留,避免和结构碰撞。

所属插件

建筑学与土木工程面向建筑与土木研究和设计:场地分析与方案设计、Revit/AutoCAD/Rhino-Grasshopper 与 OpenBIM-IFC、机电与结构协调、消防与无障碍、围护结构与日照能耗、造价与工程量,以及土木工程项目的进度、质量、安全、风险与 RFI 管理。

安装该插件会一并获得同领域的 44 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

机电管线综合协调能做什么?

Coordinates architectural design with mechanical, electrical, plumbing, and fire-protection requirements: plant rooms, shafts, risers, and service zones. Use for MEP clash-resolution planning。

如何安装机电管线综合协调?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「机电管线综合协调」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

机电管线综合协调需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

机电管线综合协调经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。