potpourri builds Pyomo AC/DC OPF models over pandapower networks. There is no PowerMCP server for it, so drive it through its Python API using the bundled scripts. Establish a credible network and base case before optimising, and a credible single period before a multi-period horizon.

Default ladder

  1. scripts/inspect_case.py --case <simbench:CODE|path.json> — load, validate, and solve the pandapower base case. Do not skip this: an OPF that fails later is usually a data problem, and this is where data problems are cheap to find.
  2. scripts/solve_opf.py --list-solvers — confirm what is installed. AC needs an NLP solver (IPOPT); DC needs an LP/MIP solver (GLPK, CBC, HiGHS).
  3. scripts/solve_opf.py --formulation dc --objective ext_grid_import — linear screening for congestion and active-power headroom.
  4. scripts/solve_opf.py --formulation ac --objective <objective> — the real answer whenever voltage, reactive power, losses, or inverter capability matters.
  5. scripts/solve_opf.py --horizon <N> --battery-penetration <pct> --seed <n> — multi-period, only once a single period is credible.

Both scripts print an engineering summary, take --json for a machine-readable payload, and exit non-zero on genuine failure (1 = solved but not optimal, 2 = bad input, 3 = no compatible solver).

Working rules

  • Never read net.res_* without checking termination. The model constructor runs pp.runpp, so net.res_* is always populated; when a solve is not optimal potpourri skips its result mapping and those tables still hold the base case. solve_opf.py reports no results at all in that situation.
  • Multi-period solve(to_net=True) writes nothing. It only logs that it did. Map each step with pyo_to_net_multi_period.pyo_sol_to_net_res(net, model, t).
  • DC gives no voltage answer. After a DC OPF net.res_bus.vm_pu is a flat 1.0 placeholder. DC feasibility never establishes AC feasibility, least of all in distribution networks where voltage and reactive power are the binding physics.
  • A local NLP optimum is not a global one. IPOPT on a nonconvex AC OPF gives a locally optimal point; say "locally optimal", and never claim global optimality without a global solver reporting it.
  • Quote numbers, units, and the limit that was configured — bus and vm_pu, element and loading_percent against its rating, MW/Mvar/MWh, and the solver's own termination condition.
  • Match the objective to the question and state its side effects: voltage- deviation minimisation puts no value on energy, so where curtailment is free it will curtail everything. Check the reported curtailment before accepting a dispatch.

Reference material

Read the file that matches what you are doing; do not load them all.

  • references/API_REFERENCE.md — verified classes, add_OPF options, objectives, devices, result extraction, and what is not supported.
  • references/FORMULATION_GUIDE.md — AC vs DC, snapshot vs multi-period, LP/NLP/MINLP consequences, and single- vs multi-period model differences.
  • references/SOLVER_GUIDE.md — solver compatibility, termination interpretation, and the ordered infeasibility diagnosis.
  • references/VALIDATION_GUIDE.md — power balance, constraint checks, binding constraints, cross-validation against pandapower, and the reporting checklist.

Local assets in this skill

  • scripts/inspect_case.py — load, validate, base power flow.
  • scripts/solve_opf.py — build, solve, validate, and escalate.
  • scripts/test_scripts.py — smoke tests; skips cleanly without solvers.
  • requirements.txt — including the pandapower<3.5 pin potpourri needs.

Escalation triggers

Quote the element, value, unit, and configured limit that tripped each row. solve_opf.py emits these in its escalation payload.

ObservationEscalate to
Bus vm_pu outside the configured [min_vm_pu, max_vm_pu] band (AC only)voltage-violation-mitigation
res_line / res_trafo loading_percent above its configured max_loading_percentthermal-overload-mitigation
termination_condition is infeasible or unbounded, or curtailment exceeds 5 % of available renewable energyoperations-planning-mitigation
Solve ends in any other non-optimal condition (other, maxIterations, maxTimeLimit), or the base pp.runpp failsconvergence-failure-mitigation
Net export through the external grid, or PV-driven voltage rise on a distribution feederder-hosting-capacity-mitigation
A newly added generator, storage unit, or large load causes any of the aboveinterconnection-impact-mitigation

Deliver

  • Network source and size, study type and formulation, horizon and resolution.
  • Objective, what it means in units, and the solver plus its termination condition.
  • Power balance, voltage extrema with buses, worst line and transformer loading, dispatch by group, curtailment, and storage SOC extrema where relevant.
  • Binding constraints, and limitations (local optimum, DC assumptions, storage modelling caveats).
  • Any justified escalation, with the numbers behind it.

示例提示词

帮我用potpourri对这个配电网做一次多时段最优潮流优化。

所属插件

电子电气与信息工程面向电气与电子工程研究:电力系统仿真(PSS/E、PSLF、PowerWorld、pandapower、PyPSA、OpenDSS、ANDES)与越限/稳定/短路处置,FPGA 时序收敛与跨时钟域检查,电路与 PCB 设计评审,硬件产品开发流程。

安装该插件会一并获得同领域的 63 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

pandapower最优潮流优化能做什么?

Runs AC/DC and multi-period optimal power flow on pandapower networks with storage and flexible resources, via bundled scripts. Use to optimize a feeder or diagnose infeasible OPF。

如何安装pandapower最优潮流优化?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「pandapower最优潮流优化」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

pandapower最优潮流优化需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

pandapower最优潮流优化经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。