Inserts an Integrated Logic Analyzer, programs the board, arms a trigger, and reads captured waveforms on real FPGA hardware. Use when sim passes but the board fails.
SKILL.md
ILA Hardware Debug
On-silicon debug methodology. Insert an Integrated Logic Analyzer (ILA), re-run implementation so the debug core is real in the routed netlist, program the board with the matching probes file, arm a trigger, capture, and read back the waveform. This is for behavior you cannot see in simulation: real I/O timing, real PLL lock, real DDR/transceiver/external-device interaction, metastability, and "works in sim, fails on the board" bugs.
The discipline here is the same as timing closure: observe before you change, insert the smallest probe that answers the question, capture FRESH hardware evidence before claiming anything, and never invent a "trigger hit" you did not read back from the device.
When to use
- "Debug on hardware", "insert an ILA", "capture a waveform on the board".
- A design passes simulation but misbehaves on real silicon (I/O, clocking, external memory/peripheral, link training, reset sequencing).
- You need to trigger on a specific live condition (
state == ERROR,fifo_full && wr_en, an address range) and see the surrounding cycles. - You need to read a current live value or drive a control bit at runtime (VIO).
- You need to verify a fix actually took effect in hardware, not just in a report.
When NOT to use
- The bug is reproducible in simulation -> use the simulation skill
(
sim_compile/sim_run/sim_probe). Sim is faster, fully observable, and free; exhaust it first. ILA only sees what you wired up and only after a full build. - A timing problem (WNS/TNS negative) -> close timing first. Probing a design that does not meet timing gives you garbage captures; the timing-closure skill comes first.
- You only need static facts about the routed design (utilization, DRC, timing, power) -> those are report tools, no hardware needed.
- You want to change RTL behavior. ILA observes; it does not fix. Use it to localize, then hand the root cause to the RTL/timing/CDC skill.
Prerequisites (verify first)
Do not skip. Most "ILA doesn't work" reports are a broken prerequisite, not a bug.
- MCP + Vivado link alive:
test_connection. If it fails, the Tcl server inside Vivado is not running — stop and tell the user to start it. - A project is open with a known top:
get_project_info. ILA insertion edits this design. - Decide the insertion path (see Decision Table). Confirm which one the
design uses before touching anything:
- Netlist (HDL) flow: mark signals in RTL ->
setup_debugon the synthesized netlist. Uselist_source_filesto confirm the RTL exists. - Block Design flow:
list_block_designs; instantiatebd_create_ila/bd_create_system_ilaand wire probes in the BD.
- Netlist (HDL) flow: mark signals in RTL ->
- Physical board reachable (for the program/capture half):
open_hardware_managerconnect_hardware_server(defaultlocalhost:3121— ahw_serverprocess must be running and the board powered + JTAG-connected). If this fails, it is an environment problem: no board, no driver, orhw_serverdown. Say so — do not fake a capture.list_hardware_targetsthenopen_hardware_target— confirm a target exists.list_hardware_devices— confirm the FPGA is detected on the JTAG chain.
- A debug-enabled bitstream + its
.ltxmust exist before you can capture. If the current bitstream has no debug core, you are in Phase A (insert), not Phase C (capture).
If any prerequisite fails, report exactly which one and stop. Do not proceed with a half-connected toolchain.
METHODOLOGY
The flow has three phases. Phase A (insert + rebuild) only runs if the design
does not already contain the ILA you need. Phase B (program). Phase C
(arm, capture, read). If a debug bitstream + .ltx already exist for the exact
signals you need, skip straight to Phase B.
Phase A — Insert / connect the ILA (only if not already present)
A1. Pick the smallest probe set that answers the question. State, before inserting, what condition you are hunting and which signals prove or disprove it. ILA costs BRAM and routing; do not blanket-probe a bus you do not need. Width × depth is the budget — capture the suspect control/handshake signals and the few data bits that matter.
A2a. Netlist (HDL) insertion — preferred when probing internal RTL signals:
mark_debug_signalfor each signal of interest. (Equivalently, the user can add(* MARK_DEBUG = "true" *)in RTL;list_debug_signalsconfirms what is marked.) These signals must survive synthesis — a signal optimized away cannot be probed; if it is missing after synth, it was merged/trimmed.run_synthesis_async-> pollget_run_statusuntil done ->get_synthesis_report. Useopen_synthesized_designso the netlist is in memory.setup_debug— auto-builds the ILA core and connects allMARK_DEBUGsignals (one clock domain per ILA core; mixed-domain signals need separate cores or you get an invalid setup).list_debug_cores+list_debug_signals— verify the core exists and the intended signals are actually attached before spending a build.implement_debug_corethenwrite_debug_probes(produces the.ltxthat the hardware side needs to name probes). Keep the.ltxnext to the bitstream soprogram_deviceauto-associates it.
A2b. Block-Design insertion — preferred for AXI / interface / system-level debug:
bd_create_system_ila(interface-aware, for AXI/AXIS/handshake interfaces) orbd_create_ila(pin-level) and configure depth withbd_ila_set_probe_width/bd_system_ila_set_slotas needed.bd_connect_system_ila_interface(interface) orbd_connect_ila_probe+bd_connect_ila_clock(pins). The ILA clock MUST be the clock of the domain you are sampling.bd_validate_design— must pass clean before generating. Unconnected probe/clock = invalid capture.bd_generate_output_and_wrapper, thenbd_wait_on_output_generation/bd_check_output_status.
A3. Size the ILA deliberately (create_ila if instantiating directly, else
the BD config tools). sample_depth ∈ {1024 … 131072}: deeper = more BRAM, more
build time. num_probes up to 64. Start modest; widen only if the first capture
proves you need more window or more signals.
A4. Re-implement and re-bitstream — the debug core must be real in routed silicon.
run_implementation_async-> pollget_run_statusuntil complete.report_drc— must be clean (debug-core insertion can introduce real DRC issues; do not ignore them).- Check timing did not regress from the inserted core:
report_timing_summary->extract_timing_metrics. If WNS went negative because of the ILA, that is a real regression — hand to the timing skill; do not paper over it. generate_bitstream. Confirm the returned.bitpath.write_debug_probesmust have produced the matching.ltx.
One change-class per build. Do not simultaneously add probes, retime RTL, and tweak strategy — if the next capture looks wrong you will not know which change caused it.
Phase B — Program the board
- Re-confirm the live connection:
open_hardware_manager,connect_hardware_server,open_hardware_target,list_hardware_devices. program_devicewith the debug.bit. Leaveprobes_fileempty to auto-detect the.ltxbeside the bitstream, or pass it explicitly. The.ltxMUST match this exact bitstream — a stale.ltxgives wrong/garbage probe names and silently meaningless captures.refresh_hardware_devicethenhw_ila_list— verify the ILA core(s) appear with the expected probe count. No ILA listed = wrong bitstream, missing.ltx, or insertion failed. Stop and fix; do not pretend to capture.
Phase C — Arm, trigger, capture, read
hw_ila_get_status— read current core status, depth, and probe names. Use the exact probe names it returns for all trigger calls.- Set the trigger (the heart of useful capture):
hw_ila_set_trigger(probe, value, operator, radix)per probe. Useradix="bin"withXdon't-care bits for bit-field conditions (e.g."XXXX1XXX"),radix="dec"/"hex"for values, andoperator∈ eq/neq/gt/lt for ranges.- Multiple probes:
hw_ila_set_trigger_condition("AND" | "OR")to combine. hw_ila_clear_triggerto reset a probe (or all) if you mis-set it.- For a free-running snapshot with no condition, skip the trigger and use
trigger_now=Truein the next step.
- Confirm the trigger before arming:
hw_ila_get_statusagain and read back the per-probe compare values and AND/OR mode. The condition you intended must be the condition shown. Settrigger_positionso you capture enough pre-trigger context (e.g. center the window). - Arm:
hw_ila_run(orhw_ila_run(trigger_now=True)for immediate). Status should report ARMED (or TRIGGERED if it fired instantly). - Provoke the condition. If a runtime stimulus is needed and a VIO exists,
hw_vio_list->hw_vio_get_probes->hw_vio_writeto drive control bits,hw_vio_readto observe live values. Otherwise the DUT/external event drives it. - Wait for capture:
hw_ila_wait(timeout=N). Final status IDLE = capture complete (trigger hit + buffer full). Still ARMED after timeout = trigger never fired — that is a real result, not an error to hide (see loop). - Read back:
hw_ila_read_data(file_path="...csv")to upload the samples and save the waveform CSV. Report the sample count and CSV path. This CSV — not any inference — is the evidence. - Cleanly
disconnect_hardwarewhen the session is done (leaving the target open can block other tools / other users of the board).
Decision table — symptom -> likely cause -> safe next action
| Symptom (from a tool, not a guess) | Likely cause | Smallest safe action |
|---|---|---|
connect_hardware_server fails | hw_server down / board off / JTAG unplugged | Environment problem — report it; do not fabricate a capture |
list_hardware_devices empty | Wrong target, power, or cable | refresh_hardware_device, re-open_hardware_target; if still empty, hardware issue |
hw_ila_list empty after programming | Bitstream has no debug core, or .ltx not associated | Re-program with the debug .bit; confirm matching .ltx; if none exists, do Phase A |
Probe name from RTL not in hw_ila_get_status | Signal optimized away in synth, or stale .ltx | Re-check list_debug_signals; if trimmed, mark a retained equivalent / add keep; regenerate .ltx with the bitstream |
hw_ila_wait stays ARMED (never triggers) | Trigger condition never true, wrong radix, wrong probe, or signal stuck | Re-verify condition via hw_ila_get_status; loosen with don't-cares / trigger_now=True to snapshot; check the signal is even toggling |
| Capture looks like noise / constant | Wrong clock domain on ILA, or .ltx/.bit mismatch | Confirm ILA clock = sampled domain; re-pair .bit + .ltx; rebuild if domain is wrong |
| ILA insertion broke timing (WNS<0) | Debug core added load/routing pressure | Reduce depth/probe count; if still negative, hand to timing-closure skill — do not waive |
report_drc errors after implement_debug_core | Real DRC from inserted core (clocking, BUFG, etc.) | Fix the DRC; never ignore to force a bitstream |
| Need to change a control bit live | Static probing insufficient | Add/Use a VIO (bd_create_vio / create_vio), then hw_vio_write |
Capture loop (iterate until the trigger answers the question)
This is a measure -> adjust trigger -> re-measure loop. The only thing that changes between iterations should be the trigger condition, not the bitstream — re-arming is seconds, re-building is minutes.
1. hw_ila_get_status # confirm probes + current condition
2. hw_ila_set_trigger (+ condition) # one trigger hypothesis at a time
3. hw_ila_get_status # VERIFY the condition you intended is set
4. hw_ila_run # arm
5. (provoke; hw_vio_write if needed)
6. hw_ila_wait(timeout=N) # IDLE = captured; ARMED = no trigger
7. hw_ila_read_data(file_path=...) # save CSV evidence
-> inspect: did the captured window contain the event?
STOP conditions — halt the loop and report:
- Captured the event:
hw_ila_waitreturned IDLE and the CSV shows the condition + surrounding cycles. Done — report the CSV. - Trigger genuinely never fires after loosening (don't-cares /
trigger_now) and you have confirmed the probe is toggling: this is a finding — the condition you expected does not occur in hardware. Report it; hand the root cause to the RTL/CDC/timing skill. Do not keep re-arming hoping it changes. - Window too small / wrong signals: if you need a deeper buffer or more probes than the current core has, you must return to Phase A (rebuild). Do this deliberately, one change-class at a time — note it as a build iteration, not a loop iteration.
- Need an RTL/architectural fix: ILA localized the bug. ILA cannot fix it. Present the captured evidence + the hypothesis and hand off. Do not loop.
- Hardware/connection lost mid-loop:
refresh_hardware_device; if the device is gone, stop — it is an environment failure, not something to retry forever.
Each iteration, show the trigger you set and the resulting status (ARMED vs IDLE) so cause and effect are attributable.
Safety rails (do not violate)
- Evidence before claims. "Triggered", "captured", "the signal does X on
hardware" REQUIRE a fresh
hw_ila_waitIDLE result and a realhw_ila_read_dataCSV from this programmed device. Never infer a capture from simulation, from a report, or from a prior run. If you did not read it back from silicon, you do not know it. .ltxmust match the.bit. Programming a debug bitstream with a stale or foreign.ltxyields plausible-looking but meaningless probe names and data. Always regeneratewrite_debug_probeswith the bitstream and verify probe names viahw_ila_get_status.- No fake-pass on the rebuild. Inserting an ILA can create real DRC violations
or break timing (WNS<0). Do NOT waive DRC,
set_false_path, or relax timing just to get a debug bitstream out. If the inserted core breaks signoff, that is a real regression — reduce the probe budget or hand to the timing/DRC skill. Any exception requires an explicit stated assumption and, if it could be real, asking the user first. - Observe, don't silently edit. ILA is a measurement instrument. Do not modify RTL to "make the trigger fire." If the design must change, recommend the edit with the captured evidence; let the human / the RTL skill apply it.
- Smallest probe first. Constraints/marking before re-architecting; a few targeted probes before a wide bus. Don't blow the BRAM/depth budget on a fishing expedition.
- No invented tools. Only the
hw_ila_*,hw_vio_*,hw_axi_*, hardware- manager,*_debug*,bd_*ila*, and build tools named here exist. If a needed capability (e.g. cross-trigger, advanced sequencer) is not in the toolset, say so plainly rather than pretending. - VIO writes drive real hardware.
hw_vio_writetoggles live control bits on a running board. Only drive probes whose effect you and the user understand; confirm before writing anything that could put external hardware in a bad state. - Leave the target clean.
disconnect_hardwarewhen done so the board/JTAG is not left locked.
Output
Report, in order:
- Insertion summary (if Phase A ran): which path (netlist vs BD), signals
probed (from
list_debug_signals/hw_ila_get_status), ILA depth × probe count, and the post-implementation evidence that the rebuild is clean —report_drcresult + WNS/TNS fromextract_timing_metrics. State explicitly whether the ILA changed timing. - Program confirmation: bitstream path,
.ltxpath, and thehw_ila_listoutput proving the core is live on the device. - Trigger setup: the exact per-probe compare values + AND/OR mode, copied
from
hw_ila_get_status(the verified condition, not the intended one). - Capture result: final
hw_ila_waitstatus (IDLE = success), sample count, and the saved CSV path fromhw_ila_read_data. If it never triggered, say so and state what that implies. - Finding + handoff: what the waveform shows about the original question, and — if a fix is needed — the recommended RTL/timing/CDC action handed to the appropriate skill, with the CSV as evidence. Never close with an unverified "fixed on hardware" claim.
示例提示词
设计在仿真里没问题但上板失败了,帮我插ILA抓波形定位问题。
所属插件
安装该插件会一并获得同领域的 63 个 Skill / MCP。
同插件的其他科研 Skill
- ANDES电力系统动态仿真Runs ANDES power-system dynamic studies via PowerMCP: power flow, eigenvalue analysis, and time-domain simulation. Use for damping, stability, or oscillation-mode questions.
- 电池选型与电源预算Builds an evidence-tagged power budget and sizes a manufacturable battery with pouch outline, seals, and derating. Use when sizing runtime, mAh, charging, or supply rails.
- FPGA比特流生成与烧录Generates a Xilinx FPGA bitstream and programs it over JTAG, or burns an MCS image into flash for power-on boot. Use when flashing a board or diagnosing boot failures.
- 硬件项目发布包组装Assembles a hardware release package (fab files, BOM/CPL, carts, assembly guide, hashed manifest) and runs a ready-to-build gate. Use before ordering prototypes.
- 时钟域交叉风险审查Audits clock-domain-crossing risk on an FPGA design and applies the smallest safe synchronizer or constraint fix. Use to resolve CDC violations before sign-off.
- 硬件产品认证合规规划Plans certifications a hardware product needs per target market (FCC, CE/RED, UKCA, battery/radio rules), with cost and lead-time estimates. Use before PCB or enclosure tooling.
- Vivado XDC时序约束编写Authors a Vivado XDC timing constraint set from scratch: clocks, I/O delays, and timing exceptions. Use first, before timing closure, on a design with no or incomplete constraints.
- N-1/N-2应急违规处置Playbook for N-1/N-2 contingency violations: ranks contingencies and proposes preventive and corrective actions. Use after a study shows voltage or thermal problems.
- 潮流计算不收敛诊断Playbook for power-flow convergence failures in PSS/E, PSLF, PowerWorld, pandapower, PyPSA, surge, or OpenDSS. Use when a case diverges or fails to solve.
- 硬件成本核算与采购Prices a hardware product at multiple volumes with one-time vs per-unit cost, landed cost per country, and sourcing leads. Use to estimate unit cost before a pitch.
- RTL仿真覆盖率收敛Measures RTL simulation code coverage and iteratively closes it toward a target by adding testbench stimulus. Use for a sign-off-grade coverage report.
- 配电网DER接纳能力治理Playbook for distribution DER hosting-capacity limits: voltage rise, reverse flow, and thermal limits from PV and storage. Use to estimate how much DER a feeder can host.
- 电子电路设计与审查Designs, audits, or corrects an electronic circuit from a brief, schematic, or netlist, checking power domains, reset sequencing, and ratings. Use for circuit review.
- 硬件可制造性红队审查Red-team audit that fix-loops a hardware project to ready-to-build, re-deriving parts, rails, battery physics, and cost. Use for a reality check before committing to a design.
- 电力系统动态稳定处置Playbook for dynamic stability problems: poor damping, angle instability, or sustained oscillations from eigenvalue or time-domain studies. Use after an unstable study result.
- Egret电力市场调度优化Runs Egret market/operations optimization (DC-OPF, AC-OPF, unit commitment) via PowerMCP. Use for cheapest dispatch, unit commitment, or congestion checks.
- 电子元器件选型核查Researches electronic components against primary sources: part numbers, datasheet limits, lifecycle, stock, and price breaks, one dossier per part. Use to verify or source a BOM.
- EMC电磁兼容预测试Plans grounding, shielding, and filtering for EMC/EMI, and runs an emissions pre-scan with a root-cause fix sequence. Use before a lab test or after a failed EMI scan.
- 产品外壳参数化建模Designs a hardware enclosure as parametric CAD with STEP/STL/GLB output, a DFM check, and Blender assembly validation. Use when designing a case or checking fit.
- 电网频率响应问题处置Playbook for frequency problems: low inertia, high RoCoF, weak primary response, or UFLS risk after loss of the largest unit. Use when a study flags frequency issues.
- FPGA RTL到比特流全流程Drives a Xilinx FPGA design end to end through RTL, simulation, synthesis, implementation, and bitstream, gated at every stage. Use to run the complete build flow in one pass.
- 硬件产品全流程总协调Leads a physical electronic product from idea to a doable design, coordinating specs, parts, battery, PCB, enclosure, render, and cost sub-skills. Use starting a hardware product.
- 硬件原理图与BOM审查Reviews hardware projects: checks schematics against datasheets, pin connections, and firmware-to-hardware alignment across KiCad/Altium files. Use for a design alignment check.
- 新能源并网影响评估Playbook for screening the grid impact of a new generator, storage, or large-load interconnection. Use to check whether a given MW can connect and what upgrades it needs.
常见问题
FPGA ILA在线逻辑调试能做什么?
Inserts an Integrated Logic Analyzer, programs the board, arms a trigger, and reads captured waveforms on real FPGA hardware. Use when sim passes but the board fails。
如何安装FPGA ILA在线逻辑调试?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「FPGA ILA在线逻辑调试」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
FPGA ILA在线逻辑调试需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
FPGA ILA在线逻辑调试经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。