科研 Skill

ANDES电力系统动态仿真

andes

Runs ANDES power-system dynamic studies via PowerMCP: power flow, eigenvalue analysis, and time-domain simulation. Use for damping, stability, or oscillation-mode questions.

发布者 Codar安全审核通过v0.1.0更新于 2026-11-18

SKILL.md

ANDES workflow

Expose ANDES tools in stages. Do not jump into dynamics until the base case is loaded, solved, and understood.

Default tool ladder

  1. run_power_flow(file_path) to load the case and solve the steady-state point.
  2. get_system_info() to summarize buses, generators, dynamic states, and controls.
  3. run_eigenvalue_analysis(file_path) to screen oscillatory modes and poor damping.
  4. run_time_domain_simulation(step_size, t_end) only after the disturbance and success criteria are explicit.

Example sequence

Illustrative run on an ANDES-bundled case:

run_power_flow("ieee14.xlsx")           -> base case solved, 14 buses, 5 generators
get_system_info()                       -> dynamic models, governor and exciter types
run_eigenvalue_analysis("ieee14.xlsx")  -> dominant mode 0.42 Hz, damping 3.1%
run_time_domain_simulation(0.01, 10.0)  -> generator trip at t=1s, monitor rotor angles

The 3.1% damping is below the ~5% screening threshold, so this case escalates to dynamic-stability-mitigation rather than stopping at "the modes look weak".

Working rules

  • Re-run the base power flow after any model or dispatch change before dynamic work.
  • State the disturbance, clearing time, monitored channels, and pass or fail criteria before time-domain runs.
  • Treat eigenvalue results as screening. Confirm critical cases in time domain.

Escalation triggers

Quote the failing metric (mode + damping ratio, channel + recovery time) rather than saying "it is unstable".

ObservationEscalate to
Eigenvalue with damping ratio below ~5% or any right-half-plane modedynamic-stability-mitigation
Time-domain run shows growing angles, sustained oscillations, or failed voltage recoverydynamic-stability-mitigation
Base power-flow voltages outside [0.95, 1.05] puvoltage-violation-mitigation
Frequency nadir, RoCoF, or settling frequency violates its limit after a generation-loss eventfrequency-response-mitigation

Deliver

  • The case used and whether the base case solved.
  • The dynamic issue being checked.
  • The main result and whether mitigation is now required.

示例提示词

帮我用ANDES跑一下这个算例的时域仿真,看看阻尼够不够。

所属插件

电子电气与信息工程面向电气与电子工程研究:电力系统仿真(PSS/E、PSLF、PowerWorld、pandapower、PyPSA、OpenDSS、ANDES)与越限/稳定/短路处置,FPGA 时序收敛与跨时钟域检查,电路与 PCB 设计评审,硬件产品开发流程。

安装该插件会一并获得同领域的 63 个 Skill / MCP。

同插件的其他科研 Skill

常见问题

ANDES电力系统动态仿真能做什么?

Runs ANDES power-system dynamic studies via PowerMCP: power flow, eigenvalue analysis, and time-domain simulation. Use for damping, stability, or oscillation-mode questions。

如何安装ANDES电力系统动态仿真?

在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「ANDES电力系统动态仿真」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。

ANDES电力系统动态仿真需要哪些权限?

该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。

ANDES电力系统动态仿真经过官方审核吗?

是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。