PCBA项目流程协调管理
manage-pcba-program
Coordinates an evidence-gated PCBA workflow from idea through schematic, PCB, BOM, and fabrication to a reviewed order. Use for end-to-end, multi-stage project tracking.
SKILL.md
PCBA Program Manager
Coordinate specialists; do not replace them. Default shared artifacts to
.pcba-workflow/ and use only PASS, BLOCKED, or USER_REVIEW for gate
status.
Start
- Read repository instructions and inventory available descriptions, native EDA sources, generators, netlists, renders, PCB files, BOM/CPL files, manufacturing packages, test evidence, and approvals.
- Read references/stage-gates.md.
- Identify which specialist skills are installed. If a required specialist is absent, report its exact name and stop that stage; never improvise its approval.
- Initialize or validate
.pcba-workflow/program-state.jsonwithscripts/program_state.py. - When the user requests a timelapse, tutorial, case study, or recorded demo, read references/recorded-workflow.md and initialize the hash-chained event log before the first design action.
Route the work
- Description or incomplete requirements:
$plan-electronic-product. - BOM, MPN, stock, package, CAD, lifecycle, or substitution:
$qualify-pcba-sourcing. - Electrical architecture, ratings, power, reset, timing, safe state, or circuit
correctness:
$design-and-review-circuit. - Label-heavy, visually floating, overlapping, or netlist-like schematic:
$schematic-humanizerafter capturing a connectivity baseline. - Placement, routing, layers, planes, DRC, SI/PI, RF, or DFM:
$pcb-layout-review. - Gerber, drill, BOM, CPL, render, and revision-consistent release:
$release-pcba-fabrication. - Live JLCPCB quote, matching, preview, price, cart, or order:
$operate-jlcpcb-order.
Run the humanizer early when presentation blocks review, but never use its readability result as circuit approval. Require sourcing and circuit gates before placement freeze.
Manage evidence and change
- Record every artifact path, revision, SHA-256, gate status, unresolved risk, and approval evidence in program state.
- Invalidate downstream gates after controlled data changes. Use
scripts/program_state.py invalidate --change ...; do not manually preserve a stale PASS. - Keep substitution, assembly-placement, final-price, and payment approvals separate. Approval at one gate never implies another.
- Respect user intent: review-only requests do not authorize design edits, browser mutations, cart changes, or payments.
- In recorded mode, append events only after saved, inspectable checkpoints. Keep promotion-safe frames separate from private evidence, record authentic failures and corrections without staging fake defects, and validate hashes after every stage. Let the recorder snapshot mutable inputs and outputs; never edit generated sequence-scoped checkpoint copies.
- Stop on contradictory revisions, missing source-of-truth data, unverifiable safety assumptions, or a specialist BLOCKED result.
Finish
Report current gate, completed evidence, invalidated work, unresolved risks,
required user reviews, and the next specialist. A program is complete only
when the requested terminal gate is PASS and no required work remains.
For a pre-order demo, finish at order_stop: USER_REVIEW, validate and close
the recording, and do not cross its declared stop_before boundary.
示例提示词
帮我统筹一下这个电子产品从原理图到下单的整体流程进度。
所属插件
安装该插件会一并获得同领域的 63 个 Skill / MCP。
同插件的其他科研 Skill
- ANDES电力系统动态仿真Runs ANDES power-system dynamic studies via PowerMCP: power flow, eigenvalue analysis, and time-domain simulation. Use for damping, stability, or oscillation-mode questions.
- 电池选型与电源预算Builds an evidence-tagged power budget and sizes a manufacturable battery with pouch outline, seals, and derating. Use when sizing runtime, mAh, charging, or supply rails.
- FPGA比特流生成与烧录Generates a Xilinx FPGA bitstream and programs it over JTAG, or burns an MCS image into flash for power-on boot. Use when flashing a board or diagnosing boot failures.
- 硬件项目发布包组装Assembles a hardware release package (fab files, BOM/CPL, carts, assembly guide, hashed manifest) and runs a ready-to-build gate. Use before ordering prototypes.
- 时钟域交叉风险审查Audits clock-domain-crossing risk on an FPGA design and applies the smallest safe synchronizer or constraint fix. Use to resolve CDC violations before sign-off.
- 硬件产品认证合规规划Plans certifications a hardware product needs per target market (FCC, CE/RED, UKCA, battery/radio rules), with cost and lead-time estimates. Use before PCB or enclosure tooling.
- Vivado XDC时序约束编写Authors a Vivado XDC timing constraint set from scratch: clocks, I/O delays, and timing exceptions. Use first, before timing closure, on a design with no or incomplete constraints.
- N-1/N-2应急违规处置Playbook for N-1/N-2 contingency violations: ranks contingencies and proposes preventive and corrective actions. Use after a study shows voltage or thermal problems.
- 潮流计算不收敛诊断Playbook for power-flow convergence failures in PSS/E, PSLF, PowerWorld, pandapower, PyPSA, surge, or OpenDSS. Use when a case diverges or fails to solve.
- 硬件成本核算与采购Prices a hardware product at multiple volumes with one-time vs per-unit cost, landed cost per country, and sourcing leads. Use to estimate unit cost before a pitch.
- RTL仿真覆盖率收敛Measures RTL simulation code coverage and iteratively closes it toward a target by adding testbench stimulus. Use for a sign-off-grade coverage report.
- 配电网DER接纳能力治理Playbook for distribution DER hosting-capacity limits: voltage rise, reverse flow, and thermal limits from PV and storage. Use to estimate how much DER a feeder can host.
- 电子电路设计与审查Designs, audits, or corrects an electronic circuit from a brief, schematic, or netlist, checking power domains, reset sequencing, and ratings. Use for circuit review.
- 硬件可制造性红队审查Red-team audit that fix-loops a hardware project to ready-to-build, re-deriving parts, rails, battery physics, and cost. Use for a reality check before committing to a design.
- 电力系统动态稳定处置Playbook for dynamic stability problems: poor damping, angle instability, or sustained oscillations from eigenvalue or time-domain studies. Use after an unstable study result.
- Egret电力市场调度优化Runs Egret market/operations optimization (DC-OPF, AC-OPF, unit commitment) via PowerMCP. Use for cheapest dispatch, unit commitment, or congestion checks.
- 电子元器件选型核查Researches electronic components against primary sources: part numbers, datasheet limits, lifecycle, stock, and price breaks, one dossier per part. Use to verify or source a BOM.
- EMC电磁兼容预测试Plans grounding, shielding, and filtering for EMC/EMI, and runs an emissions pre-scan with a root-cause fix sequence. Use before a lab test or after a failed EMI scan.
- 产品外壳参数化建模Designs a hardware enclosure as parametric CAD with STEP/STL/GLB output, a DFM check, and Blender assembly validation. Use when designing a case or checking fit.
- 电网频率响应问题处置Playbook for frequency problems: low inertia, high RoCoF, weak primary response, or UFLS risk after loss of the largest unit. Use when a study flags frequency issues.
- FPGA RTL到比特流全流程Drives a Xilinx FPGA design end to end through RTL, simulation, synthesis, implementation, and bitstream, gated at every stage. Use to run the complete build flow in one pass.
- 硬件产品全流程总协调Leads a physical electronic product from idea to a doable design, coordinating specs, parts, battery, PCB, enclosure, render, and cost sub-skills. Use starting a hardware product.
- 硬件原理图与BOM审查Reviews hardware projects: checks schematics against datasheets, pin connections, and firmware-to-hardware alignment across KiCad/Altium files. Use for a design alignment check.
- FPGA ILA在线逻辑调试Inserts an Integrated Logic Analyzer, programs the board, arms a trigger, and reads captured waveforms on real FPGA hardware. Use when sim passes but the board fails.
常见问题
PCBA项目流程协调管理能做什么?
Coordinates an evidence-gated PCBA workflow from idea through schematic, PCB, BOM, and fabrication to a reviewed order. Use for end-to-end, multi-stage project tracking。
如何安装PCBA项目流程协调管理?
在科搭 Codar 左侧点击「插件」,在「组件」页签搜索「PCBA项目流程协调管理」并安装;在 Claude Code 或 Codex 中可以发送本页的安装提示词,或下载 Skill 包后解压到 ~/.claude/skills 或 ~/.codex/skills。
PCBA项目流程协调管理需要哪些权限?
该科研 Skill没有声明额外权限;执行具体操作时仍由 Agent 按自身规则请求确认。
PCBA项目流程协调管理经过官方审核吗?
是。SpeedSkills 收录的每个版本都会记录内容摘要与权限声明,当前版本已通过安全审核。